Navy to modernize by dropping job titles, many end in 'man' - KWWL - Eastern Iowa Breaking News, Weather, Closings

Navy to modernize by dropping job titles, many end in 'man'

Posted: Updated:
(AP) -
The U.S. Navy says it's modernizing by dropping all 89 of its enlisted sailors' job titles, many of which end in "man."
   The Navy announced Thursday sailors will no longer be addressed by rating or job title but by rank, a significant cultural shift. The Navy called for a review of the titles in January, shortly after all military jobs were ordered to be opened to women.
   A chief yeoman will now simply be called a chief, for example. A junior sailor will still be called a seaman, a naval rank steeped in tradition.
   Navy leaders say sailors can be assigned multiple occupational specialty codes, which opens up more jobs in the military and more opportunities when they leave. They say this brings the Navy in line with the other services.
  • NEWSNEWSMore>>

  • Father-son killed in plane crash lived in Iowa City

    Father-son killed in plane crash lived in Iowa City

    Monday, September 24 2018 10:00 PM EDT2018-09-25 02:00:51 GMT

    A celebration of life will be held in Iowa City, on Tuesday, for the father and son that were killed in plane crash in eastern Missouri. 

    More >>

    A celebration of life will be held in Iowa City, on Tuesday, for the father and son that were killed in plane crash in eastern Missouri. 

    More >>
  • radar alert

    TRACKING: Storm Chances through Tuesday

    TRACKING: Storm Chances through Tuesday

    Monday, September 24 2018 9:20 PM EDT2018-09-25 01:20:53 GMT

    Storm chances return tonight with strong storms possible Tuesday afternoon.

    More >>

    Storm chances return tonight with strong storms possible Tuesday afternoon.

    More >>
  • Cedar Rapids sees major flood level for second time in September

    Cedar Rapids sees major flood level for second time in September

    Monday, September 24 2018 8:05 PM EDT2018-09-25 00:05:21 GMT

    The city has prepared to protect areas along the river up to 18 feet by plugging manholes, adding additional sewer pumps and putting up Hesko Barriers on the west side of the river.

    More >>

    The city has prepared to protect areas along the river up to 18 feet by plugging manholes, adding additional sewer pumps and putting up Hesko Barriers on the west side of the river.

    More >>
Powered by Frankly